Busy day for the boys from Phil The Cracks. There are 15 x 3 storey units that need to be separated with firewalls. 2 x 13ml fyrcheck plasterboard layers need to be installed on both sides of every dividing wall between each unit. Massive undertaking but as you can see the team is up to the task. The blue seam at the top/sides and bottom is a special Fire retardant so no smoke or flame can penetrate through the firewall thus providing the necessary required time for people to evacuate and the fire brigade to respond. #hardwork #plastering #Tasmanian