Snug Primary Auditorium Entrance Plastering Complete.

The last 4 days the team and I have been busily plastering, sheeting and troweling the entrance and toilet amenities block on the new Hobart Snug Primary School Auditorium. We will sand these areas tomorrow so that the painter and vinyl layers can finish the spaces totally. The next task is the 9m high wall that needs finishing in which all the highest safety precautions will be engaged.

#plasteringtasmania #plaster #howtoplaster #philthecrackstas

Plastering Snug Primary School Auditorium

The boys from Phil The Cracks are at it again. Huge Auditorium getting plastered at the Snug Primary School. These photos taken high up in a scissor lift as we are finishing off the last of the plasterboard sheeting before we trowel up the joins, sand them all and hand it over to the builders from Maveric Constructions. Great work lads. #statewideplasterers #plaster #plastering #tasmanianplastering #philthecracks

Discovery Early Learning Centre Completed

Installed the last of 48 access panels today and I have officially handed over the Discovery Early Learning Centre to VOS Construction. What a huge effort from all involved and I truly thank my team and the Sub contractors who helped me achieve this undertaking. To my team well done men. Fantastic reviews I’ve received from the construction project manager about your efforts and professionalism. Great stuff.

To Adam and Tom, many thanks also your efforts were appreciated more than you know.(I haven’t forgot that carton Ad)

To The Platinum boys Tim and Ash. You guys also were super fantastic thoroughly enjoyed working with you both. Top quality work men.

Also quick mention to the Overton men who helped out at the end when the push was on. Thanks guys. (Cheers Rus)

Last but not least, A big shoutout to Andrew Brumby (Project Manager, VOS). Absolutely enjoyed working under your leadership, thanks for all your effort working with us on this job. Brilliant.

Also Dan Strainic ( VOS Foreman) Dan was pulled in on this job to get it moving and that he did. Working with you was great and we really got this moving with you being there on site. Big thanks from me and the boys Dan, loved your input and you made the site a happy work environment with many great laughs. Cheers bud.

To every other Tradesman who we worked with on site, cheers to you all, was great working with such professionals.

Anyway here’s some before and after photos of the Early Learning Centre and Health Hub Level 1

2 x Layer 6ml Plasterboard

This bulkhead is over 15m long and 1.6m wide. The curve on the end was achieved by wrapping 2 x layers of Flexible 6ml plaster sheet to achieve minimum thickness. It was also wet down to get this curved shaped. What a fantastic looking ceiling structure. Congrats to the architectural team from 6ty for such great design. It’s been a challenge thoroughly enjoyed to build. #excited #almosthere #teameffort #designtas #healthhub #earlylearningcentre

#imagyprocker Awards 2019

www.facebook.com/100022724000477/posts/520928135341315

Health Hub Taking Shape

Steel Walls are well under way and the new Early Learning Centre at the Launceston Health Hub is taking shape. #healthhub #steelstudwalls #philthecracks

Stages of Firewall Construction

1: Remove Old Ceiling

scamander fire rated linings

 

2: Frame up Firerated wall above Ceiling:

the one i want to use

3: Re-Sheet Fyrcheck Plasterboard Ceiling:

IMG_3371

4: Replace Existing Timber Beads:

IMG_3375

 

5: Trowel Joins and Screw Holes.

IMG_3383

 

6: Paint it and your Done.

IMG_3398

 

Thats one side of the 2 adjoining units and currently we are performing the exact same steps on the otherside in unit 2.

You are required to install firewall according to Australian Safety Standards and get Council to inspect wall and sign off before you finish.

Regards

Phil

http://www.philthecracks.com