Stages of Firewall Construction

1: Remove Old Ceiling

scamander fire rated linings

 

2: Frame up Firerated wall above Ceiling:

the one i want to use

3: Re-Sheet Fyrcheck Plasterboard Ceiling:

IMG_3371

4: Replace Existing Timber Beads:

IMG_3375

 

5: Trowel Joins and Screw Holes.

IMG_3383

 

6: Paint it and your Done.

IMG_3398

 

Thats one side of the 2 adjoining units and currently we are performing the exact same steps on the otherside in unit 2.

You are required to install firewall according to Australian Safety Standards and get Council to inspect wall and sign off before you finish.

Regards

Phil

http://www.philthecracks.com